Landfill Ruse

 

The detailed designs for Recultivation of cell I for non-hazardous waste on the territory of "regional landfill for non-hazardous, inert and hazardous waste for the municipalities of Ruse, Ivanovo, Slivo pole and Tutrakan" as well as Recultivation of cell II at the same lanfill were prepared by the company RECO engineering Ltd.

The landfill site is located in the western dry valley in the area "Podormana" east of Ruse.

The main project of landfill for solid municipal, industrial, construction and hazardous waste - Ruse was developed by the Danish company "COWI" in 2002, and was built under the ISPA program.

 

The total project area of cell 1 for closure after a suitable shaping of the waste, consist of F = 35dka. After reaching the design elevations and shaping of the waste body, according to the design, begins the construction of the technical recultivation. It consists of construction of top insulation layer and construction of recultivation layer according to the regulations in force.

 

At the end of 2015 the construction works for the technical recultivation are realized. After the technical recultivation has been fulfilled, the biological recultivation is currently (2016) in implementation.

 

The total project area of cell 2 for closure after a suitable shaping of the waste consists of F = 19.4dka. After reaching the design elevations and shaping the waste body, according to the design, begins the construction of the technical recultivation. It consists of construction of top insulation layer and construction of recultivation layer according to the regulations in force. The top insulation layer is constructed with the aim of superficial sealing of the landfill. It is designed according to the calculated volume of accumulated waste and allows natural inclusion of the landfill into the existing landscape.